El Dorado High School

You are here: G&H Specialty Concrete » » El Dorado High School

PROJECT OVERVIEW

This logo is installed in the Gym entry area after the Polished concrete Floors were installed. Using a modified epoxy system.

 
Design Type

  • Logos